Download the application logs for analysis.

Which three xplat-cli commands should you perform in sequence? To answer, move the appropriate commands from the list of commands to the answer area and arrange them in the correct order.

Answer:

Explanation:

* site connectionstring list

* site connectionstring add

* site log download

azure site log download websitename

This will download the log files for the website specified by websitename and save them to a log.zip file in the current directory.

Note:

Commands to manage your Website connection strings

site connectionstring list [options] [name]

site connectionstring add [options] <connectionname> <value> <type> [name]

site connectionstring delete [options] <connectionname> [name]

site connectionstring show [options] <connectionname> [name]

Explanation: http://azure.microsoft.com/en-us/documentation/articles/command-line-tools