What should you do first?

You administer an Azure Web Site named contoso. The development team has implemented changes to the website that need to be validated.

You need to validate and deploy the changes with minimum downtime to users.

What should you do first?
A . Create a new Linked Resource.
B . Configure Remote Debugging on contoso.
C . Create a new website named contosoStaging.
D . Create a deployment slot named contosoStaging.
E . Back up the contoso website to a deployment slot.

Answer: D

Explanation:

The deployment slots feature for Azure Websites allows validating a version of your site with full content and configuration updates on the target platform before directing customer traffic to this version. The expectation is that a deployment slot would be fully configured in the desired target format before performing a swap.

Explanation:

http://stackoverflow.com/questions/24186809/connection-strings-are-replaced-when-performing-azure-web-site-staging-swap

Latest 70-533 Dumps Valid Version with 351 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments