What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)

What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)A . 305 mm(12 in)B . 610 mm (24 in)C . 914 mm (36 in)D . 1270 mm (50 in)E . Below the area's 50-year frost lineView AnswerAnswer: B, E

August 27, 2022 No Comments READ MORE +

What's the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?

What's the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?A . =0.152 m (0.5 ft)B . =0.3 m (1 ft)C . =1 m (3 ft)D . = 5m (16 40 ft)View...

August 27, 2022 No Comments READ MORE +

Which of the following testing requirements does the designer include?

In a RFI, an ICT distribution designer instructs the contractor to test all the fibers In a PON Installation. Which of the following testing requirements does the designer include?A . Uni-directional 850 nm and 1300 nmB . Bi-directional 850 nm and 1300 nmC . Uni-directional 1310 nm and 1550 nmD...

August 26, 2022 No Comments READ MORE +

Which service is NOT typical of Grade 1?

Which service is NOT typical of Grade 1?A . TelephoneB . MultimediaC . DataD . TelevisionView AnswerAnswer: B

August 26, 2022 No Comments READ MORE +

What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?

You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?A . ThreeB . FourC . FiveD . SevenE . FourteenView AnswerAnswer:...

August 26, 2022 No Comments READ MORE +

What is the alternate spacing for the CTRs?

You are designing a multi-story dwelling and need to place the CTR's. Every floor is not available. What is the alternate spacing for the CTRs?A . Every 2 floorsB . Every 3 floorsC . Every 4 floorsD . Every 5 floorsE . 1st floor and midway up through the height...

August 26, 2022 No Comments READ MORE +

Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?

Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?A . The heat load (BTU (calories/hour) of all equipment installed within the spaceB . Location of the telecommunications own dedicated electrical distribution panelC . The quantity and size...

August 26, 2022 No Comments READ MORE +

Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?

Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?A . Resistive loopB . Ground loopC . Capacitive loopD . Inductive loopE . Conductive loopView AnswerAnswer: B

August 26, 2022 No Comments READ MORE +

For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth floor?

For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth...

August 26, 2022 No Comments READ MORE +

A design build firm has been retained by a client to construct an outpatient clinic. The client has hired an ICT distribution designer to review the DB firm's work product ensuring that the certified (mat documents are complete. In what capacity would the designer MOST LIKELY be serving?

A design build firm has been retained by a client to construct an outpatient clinic. The client has hired an ICT distribution designer to review the DB firm's work product ensuring that the certified (mat documents are complete. In what capacity would the designer MOST LIKELY be serving?A . Quality...

August 26, 2022 No Comments READ MORE +