When estimating an ICT distribution designer project timeline schedule based on the scope of work which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project? (Select two options.)

When estimating an ICT distribution designer project timeline schedule based on the scope of work which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project? (Select two options.)A . If This Then That (IFTT)B . Gantt ChartC . Work Breakdown Structure (WBS)D...

August 29, 2022 No Comments READ MORE +

What is the MINIMUM lighting requirement (or telecommunications spaces?

What is the MINIMUM lighting requirement (or telecommunications spaces?A . 50 lux (4.6 toot-candles) of lighting in the horizontal plane and 20 lux (1.9 fool-candles) of lighting in the vertical plane measured al at 1 meter (3.28 feet) above the finished floorB . 200 lux (18 6 fool-candles) of lighting...

August 29, 2022 No Comments READ MORE +

The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the MINIMUM solution/solutions for the client?

The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the...

August 29, 2022 No Comments READ MORE +

When designing an underground conduit system, a single bend should be NO MORE THAN ________ degrees.

When designing an underground conduit system, a single bend should be NO MORE THAN ________ degrees.A . 45B . 75C . 90D . 120View AnswerAnswer: C

August 29, 2022 No Comments READ MORE +

What step can be a phase of the Bidding and Negotiating process?

What step can be a phase of the Bidding and Negotiating process?A . Prepare necessary change ordersB . Identifying any conflicts that may become apparentC . Creating a response evaluationD . Identifying potential value engineering opportunitiesView AnswerAnswer: C

August 29, 2022 No Comments READ MORE +

Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?

Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?A . General ContractorB . ICT distribution designerC . ClientD . Architect. Engineering, Consultant TeamView AnswerAnswer: A

August 29, 2022 No Comments READ MORE +

An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?

An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?A . OM3 fiberB . OM4 fiberC . Both OS1 and OS2 fiberD...

August 29, 2022 No Comments READ MORE +

What size commercial DD (distribution device) is required to accommodate the increase?

You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%. What size commercial DD (distribution device) is required to accommodate the increase?A . 660 mm (26 in)B . 1015 mm (40 in)C . 1346 mm (53 in)D...

August 29, 2022 No Comments READ MORE +

Using a vertical cable support structure can create issues for the cable attached to the pathway Several issues can result It the support work is not clone correctly.

Using a vertical cable support structure can create issues for the cable attached to the pathway Several issues can result It the support work is not clone correctly. Which two of the following conditions could be caused by a poorly supported cabled (Select two options.)A . Lower dB loss valuesB...

August 29, 2022 No Comments READ MORE +

In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?

In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?A . CDB . SDC . PDD . DDView AnswerAnswer: B

August 28, 2022 No Comments READ MORE +