When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)

When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)
A . Taxes
B . Permits
C . Inspection
D . Licensing
E . Safety

Answer: B, C

Latest RCDDv14 Dumps Valid Version with 288 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments