In this scenario, what are two valid actions for this installation?

You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.

In this scenario, what are two valid actions for this installation? (Choose two.)
A . Add the new nodes to the existing cluster and switches.
B . Create a new 2-node switched cluster that uses the CN1610 cluster switches.
C . Create a new 2-node switchless cluster.
D . Migrate the existing cluster to new switches and add the new nodes.

Answer: B,D

Explanation:

Reference:

https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardware_Upgrade3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_errors_and_cannot_perform_takeover