Which branch office solution best meets the customer needs?

A customer has multiple medium and large branch sites, each of which requires between 8 and 16 APs and supports between 200 and 600 wireless clients. Every branch site has an internet connection, which it uses to reach the central data center. The customer would prefer the WAN links to...

September 26, 2019 No Comments READ MORE +

What could the architect plan to resolve all of these pain points?

A university has a dormitory with several floors. Currently, APs are deployed in the hallways about every 50 feet (15 m). The university has several issues with the existing network: - Students complain that the wireless network is very slow, and IT staff have observed a low signal in the...

September 23, 2019 No Comments READ MORE +

Which change to the existing infrastructure should the architect recommend to support all of the customer requirements?

Refer to the exhibit. A customer has a wired infrastructure shown in the exhibit. The customer is in the process of expanding their wireless services. They will now add a new wireless solution, with mobility controllers (MCs) connected as shown. The new wireless solution will support a total of 450...

September 23, 2019 No Comments READ MORE +

What else should the architect specify in the plan?

A customer has critical wired endpoints and wants to minimize the chances they will lose their connection to the network. These endpoints are dual-homed, each with two Ethernet connections that are in a link aggregation. The architect plans to deploy two 5406R switches in the closet. What else should the...

September 19, 2019 No Comments READ MORE +

Which concern should the architect raise about this plan?

Refer to the exhibit. A mall has an existing Aruba solution with 15 AP-335s. The mall now wants to add Meridian and location-based services, in particular blue dot wayfinding. The customer plans to use the built-in beacon in the existing AP radios. These Meridian licenses have been proposed: Which concern...

September 17, 2019 No Comments READ MORE +

Which change should the architect make to the plan to provide better support for the customer availability requirements?

Refer to the exhibit. A customer has these availability requirements: - loss of one controller with stateful failover and without impact on wireless client connectivity - loss of one core switch without loss of connectivity for any endpoints or APs in the building - loss of any one switch-to-switch or...

September 17, 2019 No Comments READ MORE +

Which correction should the architect make to the plan to meet the customer requirements?

Refer to the exhibit. A writing closet needs to support these devices: - 100 desktops - 5 printers - 20 AP-345s The customer wants to single-home the AP-345s and support higher than 1GbE speeds on the AP connections to future proof. The customer also requires that the closet have two...

September 15, 2019 No Comments READ MORE +

Which is one implication for the design?

A customer has phones used as wireless Voice over IP (VoIP) devices. Which is one implication for the design?A . Plan policies for the phone role on MCs to give the phones a high QoS priority.B . Ensure a -75 GHz signal in both the 2.4GHz band and the 5GHz...

September 13, 2019 No Comments READ MORE +

Which exhibit shows a campus core that meets the customer needs?

Refer to the exhibit. An architect has planned the wireless and wired access layers for a network upgrade. The entire solution must support 9,000 wireless devices and 2,250 wired endpoints. The campus core must meet these requirements: - no more than 4:1 oversubscription on the links to the data center...

September 11, 2019 No Comments READ MORE +

What should the network architect recommend for this solution?

A retailer currently has two redundant ClearPass C2000 DL360 Gen9 hardware appliances and two perpetual 1K Access licenses. The customer uses ClearPass to authenticate employee wireless devices and other corporate wireless devices. ClearPass logs indicate that peak license usage is currently 1900. The customer now wants to add a guest...

September 9, 2019 No Comments READ MORE +