Which three tools do you need to complete this installation?

You are preparing to physically install a new AFF A400 cluster into a customer’s racks. All equipment has been delivered to the customer’s site.

Which three tools do you need to complete this installation? (Choose three.)
A . additional network cables
B. Phillips #2 screwdriver
C. laptop computer
D. slide rail kit
E. cable management tray

Answer: A,B,C

Explanation:

Reference: https://docs.netapp.com/us-en/ontap-systems/a400/install-detailed-guide.html#step-1-prepare-for-installation

Latest NS0-184 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments