Which process brings the replacement fabric interconnect into the cluster?

An administrator is reptacing a fabric interconnect. The failed interconnect was FI-A and was master at the time of failure.

Which process brings the replacement fabric interconnect into the cluster?
A . Connect the new FI-A to FI-B USING THE Layer 1/Layer 2 cables only. Sync the configuration when prompted.Connect the mangement interface when the configuration is synced.
B . Connect the new FI-A to the management network and the Layer 1/Layer 2 links to the existing FI-
C . Use the full state backup file to restore the configuration when prompted at the console.
D . Connect the new FI-A to the management network only. Use the fuil state backup file to restore configuration through Cisco UCS Manager GU
E . Connect the Layer 1/Layer 2 cables
F . Connect the FI-A to the management network and the Layer 1/Layer 2 links to the existing FI­
G . Use the all configuration backup file to restore the configuration through Cisco UCS Manager GUI
H . Connect the new FI-A to the management network and the Layer 1/Layer 2 links to the existing FI-B Let the system sync with FI-B when promptend at the console

Answer: C

Latest 400-151 Dumps Valid Version with 145 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments