Which procedure should the integrator use to address the customer’s concern?

A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.

Which procedure should the integrator use to address the customer’s concern?
A . Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer’s management network.
B . Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer’s management network.
C . Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer’s management network.
D . Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer’s management network using two uplinks.

Answer: D

Latest HPE0-S58 Dumps Valid Version with 97 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments