An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment
HOTSPOT
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.

Answer: 
Explanation:
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us