In a PTP network using optical fiber, the ________ is responsible for media conversions from the optical fiber to the balanced twisted pair network within the residence.

In a PTP network using optical fiber, the ________ is responsible for media conversions from the optical fiber to the balanced twisted pair network within the residence.A . ONUB . OSC . ONTD . OLTE . OLTSView AnswerAnswer: C

August 19, 2022 No Comments READ MORE +

Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)

Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)A . ScheduleB . Contract administrationC . Legal mattersD . Technical considerationsE . Financial mattersView AnswerAnswer: A, D

August 19, 2022 No Comments READ MORE +

A project's installation start involves a Kickoff Meeting and the General Contractor's Coordination Meeting. As part of the designer's responsibilities, which two of the following ate key elements of the Kick-off Meeting? (Select two options.)

A project's installation start involves a Kickoff Meeting and the General Contractor's Coordination Meeting. As part of the designer's responsibilities, which two of the following ate key elements of the Kick-off Meeting? (Select two options.)A . Project submittal approval processB . RFI processC . Payment proceduresD . Punch List processE...

August 19, 2022 No Comments READ MORE +

In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing

In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providingA . stakeholder requirementsB . a safety planC . a user needs analysisD . specific products and materialsView AnswerAnswer: D

August 19, 2022 No Comments READ MORE +

Which two of the following are REQUIRED for the UL standard?

In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics. Which two of the following are REQUIRED for the UL standard? (Select two options.)A . Adhesion testB . Thickness testC . Texture testD . Durability testE ....

August 19, 2022 No Comments READ MORE +

Which type of scheduling chart utilizes predecessor and successor relationships when identifying tasks?

Which type of scheduling chart utilizes predecessor and successor relationships when identifying tasks?A . PERTB . CalendarC . MilestoneD . GanttView AnswerAnswer: A

August 19, 2022 No Comments READ MORE +

When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)

When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)A . TaxesB . PermitsC . InspectionD . LicensingE . SafetyView AnswerAnswer: B, C

August 18, 2022 No Comments READ MORE +

In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provide

In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provideA . Operation and Maintenance manualsB . subcontractors listsC . material lists (e.g., BOM).D . shop drawingsView AnswerAnswer: C

August 18, 2022 No Comments READ MORE +

A system integration approach of a BAS on to a LAN can usually reduce the cost of cabling-related changes by

A system integration approach of a BAS on to a LAN can usually reduce the cost of cabling-related changes byA . 10 to 20 percentB . 25 to 40 percentC . 45 percentD . 50 percentView AnswerAnswer: B

August 18, 2022 No Comments READ MORE +

When designing cable tray pathways under an access floor, what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?

When designing cable tray pathways under an access floor, what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?A . 25 mm (1 in)B . 51 mm (2 in)C . 71 mm (3 in)D . 101.60...