A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:

A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:

Data: Cutting 29

Forming 43

Stitching 17

Sealing 51
A . Sealing, Forming, Cutting, Stitching
B . Cutting, Stitching, Sealing, Forming
C . Stitching, Forming, Cutting, Sealing
D . Forming, Cutting, Sealing, Stitching

Answer: A