Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct Answers to this question.

Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct Answers to this question.
A . It checks whether the sourcing in the Production Source Item Master Data type exists.
B . It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
C . It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
D . It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
E . It checks whether the required planning level master data exists for a subset of input key figures.

Answer: C,D,E

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments