Which configuration should a Consultant recommend for the Scheduling Policy?
Universal Containers wants to ensure that Service Appointments are only assigned to Active Resources.
Which configuration should a Consultant recommend for the Scheduling Policy?
A . Match Fields
B. Preferred Resources
C. Match Boolean
D. Required Resources.
Answer: C
Latest Field Service Consultant Dumps Valid Version with 304 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	