Which action is taken by a switch port enabled for PoE power classification override?

Which action is taken by a switch port enabled for PoE power classification override?
A . When a powered device begins drawing power from a PoE switch port a syslog message is generated
B . As power usage on a PoE switch port is checked data flow to the connected device is temporarily paused
C . If a switch determines that a device is using less than the minimum configured power it assumes the device has failed and disconnects
D . If a monitored port exceeds the maximum administrative value for power, the port is shutdown and err disabled

Answer: D

Explanation:

PoE monitoring and policing compares the power consumption on ports with the administrative maximum value (either a configured maximum value or the port’s default value).

If the power consumption on a monitored port exceeds the administrative maximum value, the following actions occur:

C A syslog message is issued.

C. The monitored port is shut down and error-disabled.

C. The allocated power is freed.