Which action ensures that fc2/10 is in an up state?

Refer to the exhibit.

A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit.

Which action ensures that fc2/10 is in an up state?
A . Replace the SFP port module in fc2/10.
B . Configure the admin port type E on the upstream switch that connects the port.
C . Enable NPIV on the upstream switch that connects the port.
D . Configure the BB_credit buffers on the upstream switch that connects the port.

Answer: C

Latest 300-615 Dumps Valid Version with 95 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments