Scrum SSM SAFe 5 Scrum Master (SSM) Online Training
Scrum SSM Online Training
The questions for SSM were last updated at Jul 18,2025.
- Exam Code: SSM
- Exam Name: SAFe 5 Scrum Master (SSM)
- Certification Provider: Scrum
- Latest update: Jul 18,2025
Which meeting should the Scrum Master attend (not facilitate)?
- A . Iteration Review
- B . Scrum of Scrums
- C . Daily Stand-Up
- D . PO sync
Scrum masters help remove impediments, foster an environment for high-performing team dynamics and what else?
- A . Relentlessly improve
- B . Continuously deliver
- C . Form and re-form teams
- D . Estimate stories
Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what?
- A . Fine tune the Economic Framework
- B . Meet compliance more rapidly
- C . Lengthen the Architectural Runway
- D . Continuously improve
What is one truth about teams?
- A . Development teams can manage daily interruptions
- B . Products are more robust when individuals on teams have specific skill sets
- C . Changes in team composition do not impact productivity
- D . Teams are more productive than the same number of individuals
Which type of enabler does a System Architect review during a System Demo?
- A . Enabler Capabilities
- B . Enabler Features
- C . Enabler stories
- D . Enabler Portfolio Epics
Who can change the backlog during an iteration?
- A . Agile Team
- B . Scrum master
- C . Release Train Engineer
- D . Senior Management
Which statement is true about scrum?
- A . It is a software technical practice
- B . It is an ideal method for static design requirements
- C . it is based on empirical process control theory
- D . it is a Lean system Engineering technique
What are two common PI planning anti-patterns?
- A . Too much time spent analyzing each story
- B . Too much time spent prioritizing features
- C . Team decides which changes need to happen and when
- D . Part-time scrum masters do not have time to plan as part of the team
- E . Stories are created for the PI planning iterations
What are the three pillars of Scrum?
- A . Agility
- B . Transparency
- C . inspection
- D . adaptation
- E . Courage
Who is responsible for prioritizing the iteration backlog?
- A . Dvelopment Team
- B . Product Owner
- C . Scrum Master
- D . Business Manager