Question #1

What capabilities does SAP API Business Hub provide to help you select integration options for your project? 3 correct answers

  • A . Integration with IDE and code generation
  • B . Sandbox for testing API’s
  • C . Advice on selecting scope items in SAP Best Practice Explorer
  • D . Recommendations on using integration bus (SAP Process Orchestration or SAP Integration Suite)
  • E . Pre-packaged integration

Reveal Solution Hide Solution

Correct Answer: B,D,E
Question #2

What can you do in the SAP Roadmap Viewer tool?

  • A . Download full roadmap content for offline navigation.
  • B . Create a customer-specific version of a roadmap.
  • C . Navigate detailed Solution Implementation Roadmaps.
  • D . Comment on Deliverables and Tasks within Roadmaps.

Reveal Solution Hide Solution

Correct Answer: C
Question #3

What information doest the project team need before they can correctly estimate the relative size of backlog user stories?

  • A . definition of Done
  • B . overall project schedule
  • C . available project resource
  • D . test strategy

Reveal Solution Hide Solution

Correct Answer: A
Question #4

Which of the following is true about the Customer Center of Expertise (CCoE)?

  • A . CCoE centrally drive continuous improvement and continuous innovation.
  • B . CCoE’s mission is to provide transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems.
  • C . CCoE is an organization model which serves as collaboration hub across IT and LoBs.
  • D . CCoE is only involved during the hypercare period in supporting business processes operations.

Reveal Solution Hide Solution

Correct Answer: A,B,C
Question #5

Which of the following scenarios are enabled for the "selective data transition" Transition Path with the SAP landscape transformation tool? There are 3 answers to this question.

  • A . System consolidation
  • B . Consolidation through online data replication
  • C . Security migration
  • D . Extraction of business units
  • E . System upgrade

Reveal Solution Hide Solution

Correct Answer: A,B,D
Question #6

What is the most granular level of the methodology you can view in the SAP roadmap viewer?

  • A . Task
  • B . Deliverables
  • C . Phase
  • D . Scenario

Reveal Solution Hide Solution

Correct Answer: A
Question #7

Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase?

  • A . Validation Workshops
  • B . Data Migration Approach
  • C . Design for the Gaps and Deltas
  • D . Baseline Build
  • E . Solution Scope and Value Determination

Reveal Solution Hide Solution

Correct Answer: A,B,C
Question #8

What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements.

And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path?

  • A . Fit-to-Standard
  • B . Delta Design
  • C . Solution Validation
  • D . Design Thinking

Reveal Solution Hide Solution

Correct Answer: C
Question #9

Where can you check for the current roadmap of SAP Cloud ALM?

  • A . SAP Help Portal
  • B . SAP Community
  • C . SAP Support Portal
  • D . SAP ONE Support Launchpad

Reveal Solution Hide Solution

Correct Answer: C
Question #10

Which of the following will help you avoid modification of standard functionality in SAP S/4HANA cloud single edition? There are 3 answers to this question.

  • A . The 5 golden rules
  • B . The side-by-side extensibility option (such as SAP cloud platform)
  • C . A developer key
  • D . Contract restrictions in SAP HANA enterprise cloud and SAP S/4HANA cloud single tenant edition

Reveal Solution Hide Solution

Correct Answer: A,B,D

Question #11

What are some of the values of SAP Cloud ALM for implementation? 3 correct answers

  • A . Accelerated time to market
  • B . Central cost and effort management
  • C . NO additional cost of product
  • D . Pre-delivered SAP Activate tasks
  • E . Comprehensive document repository

Reveal Solution Hide Solution

Correct Answer: C,D,E
Question #12

In which of the following project phases is it important to plan and schedule data loads followed by load validation activities?

  • A . Prepare
  • B . Explore
  • C . Deploy
  • D . Realize

Reveal Solution Hide Solution

Correct Answer: D
Question #13

What is Scrum of Scrums?

  • A . Integration meeting among the various Scrum teams
  • B . Alternative to regular Scrum process for smaller teams
  • C . Mechanism for gathering and validating requirements
  • D . Frequent inspection of code and configuration prior to quality gates

Reveal Solution Hide Solution

Correct Answer: A
Question #14

What is the purpose of a firm-up sprint?

  • A . To revise the release plan and sprint plan
  • B . To run an end-to-end integration test
  • C . To demonstrate functionality from previous sprints
  • D . To perform string test

Reveal Solution Hide Solution

Correct Answer: D
Question #15

What are the core capabilities in SAP Cloud ALM for implementation? 3 correct answers

  • A . Task management
  • B . Custom code management
  • C . Process management
  • D . Portfolio management
  • E . Test management

Reveal Solution Hide Solution

Correct Answer: A,C,E
Question #16

Which of the following are the benefits of SAP JAM? There are 2 answers to this question.

  • A . Highly available
  • B . Reduced Recovery Time
  • C . User collaboration
  • D . Easy to use

Reveal Solution Hide Solution

Correct Answer: C,D
Question #17

What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the answer.

  • A . Configuration Composer
  • B . Expert Configuration
  • C . SAP Implementation Guide
  • D . ABAP Workbench

Reveal Solution Hide Solution

Correct Answer: C
Question #18

How can the project manager help to keep momentum in the project and help to keep the customer involved?

  • A . Increase the number of Q-Gates
  • B . Add customer resources to the project to reduce the need for formal training
  • C . Leverage agile cycles to build and test the solution
  • D . Walk through the solution processes with the stakeholders

Reveal Solution Hide Solution

Correct Answer: B,C
Question #19

Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition.

What is the sequence of selected key deliverables across the project phases? Please choose the answer.

  • A .  2nd option
    Production Readiness Check
    Detailed system Assessment
    Code Adjustment
    Validation of Migration
  • B .  4th option
    Detailed system Assessment
    Production Readiness Check
    Code Adjustment
    Validation of Migration
  • C . 3rd option
    Detailed system Assessment
    Code Adjustment
    Validation of Migration
    Production Readiness Check
  • D . 1st option
    Code adjustment
    Detailed System Assessment
    Production Readiness Check
    Validation of Migration

Reveal Solution Hide Solution

Correct Answer: C
Question #20

What activities do you perform during the fit-to-standard workshop milestone in the SAP Activate methodology within SAP Cloud ALM? 3 correct answers

  • A . Create SAP Fiori screen mock-ups in SAP Cloud ALM
  • B . View details of business process diagrams and descriptions in SAP Cloud ALM
  • C . Create notes and/or requirements in SAP Cloud ALM
  • D . Create wireframes for user interface in SAP Cloud ALM
  • E . View details of hig-level process flows in SAP Cloud ALM

Reveal Solution Hide Solution

Correct Answer: B,C,E

Question #21

Which criterion does the Product Owner use to sequence the product backlog? Please choose the answer.

  • A . Complexity
  • B . Relative effort
  • C . Resource availability
  • D . Business priority

Reveal Solution Hide Solution

Correct Answer: D
Question #22

Which new role is introduced in the SAP activate methodology in a full scrum team?

  • A . Project manager
  • B . Product owner
  • C . System administrator
  • D . Application consultant

Reveal Solution Hide Solution

Correct Answer: B
Question #23

What solution operations framework can customers use to create a joint business and IT organization?

  • A . SAP Activate
  • B . Customer Center od Expertise
  • C . SAP Roadmap Explorer
  • D . Business Transformation Management Methodology

Reveal Solution Hide Solution

Correct Answer: A
Question #24

What are some activities the project team will perform in executing project work during the Explore Phase?

  • A . Deal with user authorization requests
  • B . Collect project data and report on progress and performance
  • C . Manage risks and implement risk response activities
  • D . Establish and manage internal and external communications
  • E . Manage Background Jobs, Input and Output

Reveal Solution Hide Solution

Correct Answer: B,C,D
Question #25

What are some core objectives of business process monitoring? 2 correct answers

  • A . to provide transparency over end-to-end processes
  • B . to provide process update and change feedback
  • C . to provide reverse business process analysis
  • D . to increase business process execution quality

Reveal Solution Hide Solution

Correct Answer: A,D
Question #26

What are some extension item types can be transported from the Quality system to the Production system?

  • A . Custom Fields
  • B . Custom Business Logic
  • C . Form Templates
  • D . Query Designer Report
  • E . Communication Arrangements
  • F . Master Data
  • G . Employee Data

Reveal Solution Hide Solution

Correct Answer: A,B,C,D
Question #27

What does "de-coupling extensions" mean in SAP S/4HANA Cloud?

  • A . Extensions could conflict with future release enhancements
  • B . Extensions are applied with modifications in the HANA database
  • C . Extensions will not clash with quarterly release upgrades
  • D . Extensions are separated from the stable system of records

Reveal Solution Hide Solution

Correct Answer: D
Question #28

What is the minimum number of quality gates mandated by the SAP Activate methodology?

  • A . 4
  • B . 0
  • C . 5
  • D . 3

Reveal Solution Hide Solution

Correct Answer: A
Question #29

What are the elements in the SAP Activate Implementation Framework?

  • A . Methodology
  • B . Tools
  • C . Content
  • D . Analytics

Reveal Solution Hide Solution

Correct Answer: A,B,C
Question #30

What kind of user is enabled by SAP Cloud ALM for operations to identify disruptions and react to them? Note: There are 2 answers to this question.

  • A . Line of business user
  • B . Reference user
  • C . Communication user
  • D . IT user
  • E . End user

Reveal Solution Hide Solution

Correct Answer: A,D

Question #31

Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. Response:

  • A . Enhancement Delivery
  • B . Custom Extensions Management
  • C . Sprint Execution
  • D . Development Build

Reveal Solution Hide Solution

Correct Answer: A
Question #32

What is the difference between the "system conversion" and the "new implementation OF SAP S/4HANA transaction path. There are 2 option to this question.

  • A . In the realize phase, data is converted and not migrated for system conversion
  • B . There are different upgrade cycles
  • C . In the realize phase, custom code is adjusted rather than developed for system conversion
  • D . SSCUI’s are used in system conversion for configuring SAP S/4HANA through the manage Your solution app

Reveal Solution Hide Solution

Correct Answer: A,C
Question #33

Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the answer.

  • A . Navigate by work stream
  • B . Navigate by assigned Delivery Mode
  • C . Navigate by RACI matrix accountability
  • D . Navigate by Project Team Member Role

Reveal Solution Hide Solution

Correct Answer: A
Question #34

In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the answer.

  • A . Explore
  • B . Deploy
  • C . Prepare
  • D . Realize

Reveal Solution Hide Solution

Correct Answer: C
Question #35

What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Please choose the answer.

  • A . Learning plan
  • B . Project Documentation
  • C . Project Charter
  • D . Knowledge transfer to end users

Reveal Solution Hide Solution

Correct Answer: A
Question #36

In which phase do you verify that the SAP Best Practices content meets the customer’s business needs, and then capture gaps?

  • A . Explore
  • B . Deploy
  • C . Realize
  • D . Prepare

Reveal Solution Hide Solution

Correct Answer: A
Question #37

What are some characteristics of SAP S/4HANA Cloud?

  • A . SAP S/4HANA Cloud provides additional functionality for customers that require broad extensions and deep configuration capabilities.
  • B . SAP S/4HANA Cloud includes quarterly innovation cycles.
  • C . SAP S/4HANA Cloud is single-tenant; meaning your service runs in a dedicated environment.
  • D . SAP S/4HANA Cloud is multi-tenant, meaning your service runs in a shared environment.
  • E . SAP S/4HANA Cloud runs in an infrastructure with private, managed services for SAP solutions.

Reveal Solution Hide Solution

Correct Answer: B,D
Question #38

Which of the following is a key characteristic of the Agile project approach?

  • A . Formal and detailed documentation
  • B . Frequent and detailed project scheduling
  • C . Iterative build with frequent inspections
  • D . Frequesnt quality gates

Reveal Solution Hide Solution

Correct Answer: C
Question #39

What are the three elements of SAP Activate? There are 3 correct answers to this question.

  • A . Methodology
  • B . Tools
  • C . Focused Build Content
  • D . SAP Solution Manager
  • E . Content

Reveal Solution Hide Solution

Correct Answer: A,B,E
Question #40

Your are defining the test strategy for your project .

What would you include in a Scope of Integration test?

  • A . the network communication
  • B . the functionality of end-to-end business processes
  • C . the functionality of modular processess
  • D . the connectivity between database and application servers

Reveal Solution Hide Solution

Correct Answer: B

Question #41

Which of the following is part of the Explore phase in the "New implementation od SAP S/4 HANA Cloud" transition path?

  • A . Simplification and custom code impact analysis
  • B . Setup and enablement
  • C . Fit-to-standard
  • D . Solution validation and Delta design

Reveal Solution Hide Solution

Correct Answer: C
Question #42

How can a customer get access to SAP Cloud ALM?

  • A . SAP Cloud ALM fair usage rights are included in SAP Enterprise Support, cloud editions at NO additional cost
  • B . SAP Cloud ALM fair usage rights are included in SAP Preferred Success and SAP Preferred Care at NO additional cost
  • C . SAP Cloud ALM fair usage rights are included in SAP May Attention and SAP Active Attention at NO additional cost
  • D . SAP Cloud ALM can be bought on the SAP Store

Reveal Solution Hide Solution

Correct Answer: A
Question #43

What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the system conversion?

  • A . Simplification item check (Si-check)
  • B . Software provisioning manager
  • C . SAP code inspector
  • D . Software update manager with database migration option

Reveal Solution Hide Solution

Correct Answer: A
Question #44

Which activity helps the project team to add the user stories to the product backlog? Please choose the answer.

  • A . Planning the User Acceptance Test
  • B . Conducting the Solution Validation
  • C . Assessing Project Risks
  • D . Preparing a Project Schedule

Reveal Solution Hide Solution

Correct Answer: B
Question #45

In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the answer.

  • A . Realize
  • B . Deploy
  • C . Prepare
  • D . Explore

Reveal Solution Hide Solution

Correct Answer: D
Question #46

What is the correct order of the SAP Activate Methodology phases?

  • A . Prepare -> Discover -> Explore -> Realize -> Deploy -> Run
  • B . Discover -> Prepare -> Explore -> Realize -> Deploy -> Run
  • C . Plan -> Build -> Run -> Sustain
  • D . Plan -> Design -> Build -> Operate

Reveal Solution Hide Solution

Correct Answer: B
Question #47

The activities in the transition path of SAP S/4HANA Cloud, Single-Tenant Edition (STE) and SAP S/4HANA Cloud are very similar, what are the major differences?

  • A . SAP S/4HANA Cloud STE is configured through IMG while SAP S/4HANA Cloud through SSCUI’s.
  • B . Different tools are used to manage Application Lifecycle of SAP S/4HANA Cloud STE.
  • C . SAP S/4HANA Cloud STE has shorter release cycles comparing to SAP S/4HANA Cloud.
  • D . SAP S/4HANA Cloud STE has longer release cycles comparing to SAP S/4HANA Cloud.

Reveal Solution Hide Solution

Correct Answer: A,B,D
Question #48

Who determines the priority of user stories in the backlog of an Agile project?

  • A . Project Team
  • B . SCRUM Master
  • C . Project Manager
  • D . Product Owner

Reveal Solution Hide Solution

Correct Answer: D
Question #49

What is SAP Activate? Please choose the answer.

  • A . A combination of SAP best practices, methodology, and guided configuration
  • B . A methodology for each of the deployment modes (cloud, on-premise, hybrid)
  • C . A step-by-step instruction on how to remove from SAP best practices to your custom solution
  • D . A bundle of ASAP, SAP Launch, and Rapid Deployment Solutions

Reveal Solution Hide Solution

Correct Answer: A
Question #50

Which activities are critical for delivering Agile projects? There are 2 answers to this question.

  • A . Blueprint scheduling
  • B . Release planning
  • C . Sprint planning
  • D . Retrospective agenda creation

Reveal Solution Hide Solution

Correct Answer: B,C

Question #51

What are the responsibilities of the Project Team on level 4 in the picture below? There are 2 answers to this question.

  • A . Set Project policy, standards and oversight
  • B . Identify and resolve issues and risks
  • C . Perform status reporting and communication
  • D . Set business priorities, goals and objectives

Reveal Solution Hide Solution

Correct Answer: B,C
Question #52

In which phase do you create "an ordered list of everything that is known to be needed in the Product?

  • A . Deploy
  • B . Realize
  • C . Explore
  • D . Prepare

Reveal Solution Hide Solution

Correct Answer: B
Question #53

SAP S/4HANA is based on SAP HANA platform with SAP Fiori UX.

  • A . True
  • B . False

Reveal Solution Hide Solution

Correct Answer: A
Question #54

In the "new implementation of SAP S/4HANA" transition path, which systems are part of the project system landscape? There are 2 answers to this question.

  • A . Starter system
  • B . QAS
  • C . P-system
  • D . DEV

Reveal Solution Hide Solution

Correct Answer: B,D
Question #55

Custom Code Management process in SAP Solution Manager provides which of the following capabilities?

  • A . Define KPIs and report on CCM data
  • B . Retire unused/obsolete custom code objects
  • C . Perform static code checks integrated into ABAP Development Tools on security, performance and syntax Replace custom developments with standard functions without necessity of a business process redesign and dedicated project
  • D . Identify custom code and collect its usage statistics

Reveal Solution Hide Solution

Correct Answer: A,B,D
Question #56

What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements? There are 2 correct answers to this question.

  • A . Run SAP Like a Factory
  • B . Always Connected
  • C . Intelligent Enterprise
  • D . Build SAP Like a Factory

Reveal Solution Hide Solution

Correct Answer: A,D
Question #57

What is the purpose of the scrum board?

  • A . To manage the resource load
  • B . To show the functional breakdown of the solution scope
  • C . To document the results of the integration test
  • D . To visualize team progress

Reveal Solution Hide Solution

Correct Answer: D
Question #58

Which types of tests are supported by Test Management in SAP Cloud ALM? Note: There are 2 answers to this question.

  • A . Acceptance testing
  • B . Integration of automated testing
  • C . Manual testing
  • D . System testing

Reveal Solution Hide Solution

Correct Answer: B,C
Question #59

What are the Transition Paths to SAP S/4HANA?

  • A . Database Transition
  • B . New Implementation
  • C . System Conversion
  • D . Selective Data Transition

Reveal Solution Hide Solution

Correct Answer: B,C,D
Question #60

In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP? Please choose the correct answer.

  • A . Realize
  • B . Prepare
  • C . Explore
  • D . Discover

Reveal Solution Hide Solution

Correct Answer: D