One of the steps when rerating a pressure vessel is the documentation of the:

One of the steps when rerating a pressure vessel is the documentation of the:A . Approval of the ASMEB . Report from an external professional engineerC . Approval of the operation’s engineering departmentD . Calculations from the manufacturer or the owner-user’s engineerView AnswerAnswer: D

March 19, 2024 No Comments READ MORE +

When the half bead or temper bead technique of repair is proposed, the first consideration that must be given should be;

When the half bead or temper bead technique of repair is proposed, the first consideration that must be given should be;A . Close monitoring of the welding operationB . A metallurgical review conducted by an engineer shall be performed to assure the proposed alternative is suitable for the applicationC ....

March 18, 2024 No Comments READ MORE +

Unless there is indicative information on the brittle characteristics of the vessel material, the test temperature of the metal during a pressure test need not exceed what temperature?

Unless there is indicative information on the brittle characteristics of the vessel material, the test temperature of the metal during a pressure test need not exceed what temperature?A . 130˚FB . 120°FC . 60°FD . 200˚FView AnswerAnswer: B

March 18, 2024 No Comments READ MORE +

When both the ownership and the location of a pressure vessel are changed, what must be done?

When both the ownership and the location of a pressure vessel are changed, what must be done?A . The vessel must be inspected and certified by the original vessel manufacturerB . The vessel must be externally and internally inspected prior to re-useC . The vessel must be inspected externally and...

March 17, 2024 No Comments READ MORE +

At the discretion of ________, on-stream inspection may be substituted for internal inspection.

At the discretion of ________, on-stream inspection may be substituted for internal inspection.A . An engineer experienced in corrosionB . The owner-user of the pressure vesselC . An engineer experienced in pressure vessel designD . The authorized pressure vessel inspectorView AnswerAnswer: D

March 16, 2024 No Comments READ MORE +

If there is a conflict between the requirements of API 510 and the legal jurisdiction, which should be followed?

An in-service vessel is being repaired or altered. If there is a conflict between the requirements of API 510 and the legal jurisdiction, which should be followed?A . API 510B . the legal jurisdictionC . the most stringent requirementsD . either set of requirements based on engineer and AI approvalView...

March 16, 2024 No Comments READ MORE +

Pressure relieving device repair organizations shall have a fully documented quality control system and which of the following?

Pressure relieving device repair organizations shall have a fully documented quality control system and which of the following?A . A valve Repair Certificate of Authorization issued by the APIB . A Valve Repair Certificate of Authorization issued by the National BoardC . Fully documented training programD . A Valve Repair...

March 14, 2024 No Comments READ MORE +

The best description of Temper embrittlement is:

The best description of Temper embrittlement is:A . Cracking due to operating at high temperatures above 650°F C 1100°FB . Cracking due to low temperature serviceC . Loss of ductility and notch toughness due to exposure above 650°F C 1100°FD . Flaking of the metal surfaces, causing dip pits due...

March 14, 2024 No Comments READ MORE +

For an above ground 'higher risk' vessel the maximum interval between external visual inspections is:

For an above ground 'higher risk' vessel the maximum interval between external visual inspections is:A . 10 years or 1/2-remaining corrosion rate life, whichever is lessB . 5 yearsC . 3 yearsD . There is no maximum intervalView AnswerAnswer: A

March 14, 2024 No Comments READ MORE +

When must both an internal and external inspection always be performed?

When must both an internal and external inspection always be performed?A . at installation of vesselB . whenever there is a change in fluid serviceC . whenever the vessel's ownership changesD . whenever the vessel's ownership and location changesView AnswerAnswer: D

March 13, 2024 No Comments READ MORE +