You use a status profile in the quality info record in procurement, under which circumstances does the system create an inspection lot of the next supplier relationship during gr processing?
You use a status profile in the quality info record in procurement, under which circumstances does the system create an inspection lot of the next supplier relationship during gr processing?
A . When the vendor attains an A in the vendor Evolution
B. When the usage decision for the previous inspection lot was rej
C. When there is an open inspection lot for the current supplier relationship status
D. When the UD for the previous inspection lot was accepted
Answer: D
Latest C_TS414_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments