What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing………

What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing………
A . Configuration settings
B. Settings for the inspection type activated in the material level
C. Master inspection characteristic linked to class characteristics
D. Usage of the class characteristics in the task list

Answer: C