- All Exams Instant Download
Which two root causes can be identified to help remediate the issue?
Upon checking the latency goal under vSAN performance diagnostics, the vSAN Administrator sees this message displayed:
The increase in latency in the vSAN stack might be beyond expected limits.
Which two root causes can be identified to help remediate the issue? (Choose two.)
A . vSAN VMKemel portgroup is configured with the “Route based on IP hash” teaming policy
B . vSAN encryption is enabled
C . Large packet losses and retransmissions on the network layer
D . Incorrect sizing of the disk groups capacity disks
E . One or more disk groups are congested
Answer: C, E
Explanation:
Reference: https://kb.vmware.com/s/article/2150018
Latest 5V0-21.21 Dumps Valid Version with 50 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments