Which two consideration should the administrator make sure to remember when creating the flow?

AW Computing wants to create a process to assign accounts to different salespeople based on the annual revenue…. of the company. The administrator has decided to create a flow.

Which two consideration should the administrator make sure to remember when creating the flow? Choose 2 answers
A . Use a Get Record component instead of hard coding record IDs.
B . The running user of a flow is the user that last saved the flow.
C . Update record elements should be placed outside the flow loop.
D . Update Record elements should be placed inside the flow loop.

Answer: A, C

Explanation:

Using a Get Record component allows the flow to dynamically retrieve records based on criteria or record IDs without hard coding them. This makes the flow more flexible and maintainable. Updating record elements outside the flow loop prevents unnecessary DML operations and reduces the risk of hitting governor limits.

Latest ADX-201E Dumps Valid Version with 243 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments