Which two components would you consider reseating or replacing before you perform actions on the physical port where the errors are reported from the node?

You observe cyclic redundancy check (CRC) errors on a network port from a node in the cluster.

Which two components would you consider reseating or replacing before you perform actions on the physical port where the errors are reported from the node? (Choose two.)
A . SFP
B . cluster interconnect switch
C . up-stream switch
D . cable

Answer: C,D

Latest NS0-194 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
1 Comment
Inline Feedbacks
View all comments
KZM
KZM
2 years ago

The answer should be “A” and “C”, I think.