Which two actions ensure normal operations of this IM&P high-availability cluster?

Refer to the exhibit.

After configuration of the Cisco IM&P cluster in high-availability mode, both IM&P servers remain in the initializing state.

Which two actions ensure normal operations of this IM&P high-availability cluster? (Choose two.)
A . Clear the Enable High Availability check box in the Presence Redundancy Group configuration.
B . Confirm that Cisco Presence Engine, Cisco XCP Router, and Cisco DB services are up and running on both IM&P servers.
C . Restart the Server Recovery Manager service in Cisco Unified Serviceability C Network Services on both IM&P servers.
D . Verify that the Cisco XCP SIP Federation Connection Manager service is running.
E . Ensure that an equal number of users are assigned to each IM&P server.

Answer: BE

Explanation:

Reference: https://www.cisco.com/c/en/us/td/docs/voice_ip_comm/cucm/im_presence/configAdminGuide/10_5_1/CUP0_BK_CE43108E_00_config-admin-guide-imp-105/CUP0_BK_CE43108E_00_config-admin-guide-imp-105_chapter_010010.html