Which three actions should you perform?
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
A . Set the operation route type as Standard.
B . Set the input warehouse on the resource to the vendor warehouse.
C . Set the operation route type as Vendor.
D . Set all BOM lines warehouse to the production warehouse.
E . Set all the BOM lines to resource consumption.
Answer: B,C,D
Latest MB-320 Dumps Valid Version with 141 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	