Which solution will meet their requirements?

A team currently uses a single project to track both features and tasks.

They will be adopting aqile practices, as follows:

• Features will be developed during three week iterations.

• Tasks will be handled based on priority and rank and released incrementally as needed.

they want to use agile boards with minimal disruption to their current configuration.

Which solution will meet their requirements?
A . a Kanban board in the current project with separate swimlanes per issue type
B . two Scrum boards for the current project, one for each issue type
C . a Scrum board in the current project with two quick fillers to show each issue type separately
D . a second project for tasks with a shared configuration and separate boards per project
E . a Kanban board for tasks and a Scrum board for features in the current project

Answer: E

Explanation:

The solution that will meet the team’s requirements of using agile boards with minimal disruption to their current configuration is to use a Kanban board for tasks and a Scrum board for features in the current project. This way, they can use different agile methodologies for different issue types without creating a new project or changing their existing configuration. They can use a Kanban board for tasks to handle them based on priority and rank and release them incrementally as needed. They can use a Scrum board for features to develop them during three week iterations with sprints and backlogs.

The other solutions are either not feasible or not optimal for their needs. Therefore, the correct answer is E.

Reference: [Creating a board], [Using a Scrum board], [Using a Kanban board]

Latest ACP-610 Dumps Valid Version with 65 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments