Which of the following will always describe the critical path? The path with

Which of the following will always describe the critical path? The path with
A . The longest duration through the network.
B . Zero float.
C . Negative float.
D . The shortest duration and negative float.

Answer: B

Latest AACE-PSP Dumps Valid Version with 120 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments