Which field in the material master record controls whether external requirements should be included in the net requirements calculation during reorder point planning?

Which field in the material master record controls whether external requirements should be included in the net requirements calculation during reorder point planning?
A . MRP type
B . MRP profile
C . MRP group
D . MRP controller

Answer: C