Which additional task must the engineer perform on Router 1 so that all outbound traffic utilizes the link between R1 and R3 to reach ASN 4567?
Refer to the exhibit.

An engineer is configuring path selection on router R1 for two ASNs as shown.
Which additional task must the engineer perform on Router 1 so that all outbound traffic utilizes the link between R1 and R3 to reach ASN 4567?
A . Configure a low weigh! on the peer to ASN 4567.
B. Configure a high weight on the peer to ASN 4567.
C. Configure an AS path prepend on the peer to ASN 4567.
D. Configure a high med on the peer to ASN 4567.
Answer: B
Latest 350-501 Dumps Valid Version with 248 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	