What should you add the BOM to meet the customer needs?

Refer to the exhibit, which reflects the Bill of Materials (BOM) configuration for one datacenter.

A customer needs a new storage solution of two HPE 3PAR 8440 arrays. The customer’s environment consists of eight physical servers in each data center attached to the SAN and one StoreOnce 3540 system with two FC I/O cards. The distance between data centers is less than 75 meters.

What should you add the BOM to meet the customer needs?
A . one HPE 25m Mini SAS High Density Active Optical Cable for each HPE 3PAR 8440
B . one HPR 3PAR StoreServ AC RPS Service Processor
C . one HPE 3PAR StoreServ 8000 Direct Connect Cabling Option for Drive Enclosure for each HPE 3PAR 8440
D . one HPE SN3000B SAN Switch 12-port Upgrade E-LTU per switch, appropriate number of SFPs and
cables

Answer: B

Latest HPE0-J58 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments