What conclusion can be drawn about the VxRail deployment from the exhibit?
View the Exhibit.

You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
A . Top of Rack (ToR) switches will use two uplink ports
B . Upstream switches will have two ISLs
C . Two Top of Rack (ToR) switches will be used
D . Two Upstream switches will be used
Answer: B