What are two possible ways to achieve the goal?

You need to prepare to deploy a software deployable package to a test environment.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
A . In Visual Studio, export the project and upload the project to the asset library.
B . In Azure DevOps, queue a build from the corresponding branch and upload the model to the asset library.
C . In Azure DevOps, queue a build from the corresponding branch and upload the package to the asset library.
D . In Visual Studio, create a Dynamics 365 deployment package and upload the package to the asset library.

Answer: CD

Explanation:

C: Dynamics Lifecycle Services (LCS) Asset Upload : Upload a software deployable package to an LCS project’s Asset Library. This task is only available as a release pipeline task. It requires an LCS connection to be setup in the Azure DevOps project’s service connections.

D: Deployable packages can be created by using Visual Studio dev tools. After a deployable package is created, it must be uploaded to the Lifecycle Services (LCS) project’s asset library.

Reference: https://marketplace.visualstudio.com/items?itemName=Dyn365FinOps.dynamics365-finops-tools

https://docs.microsoft.com/en-us/dynamics365/fin-ops-core/dev-itpro/deployment/create-apply-deployable­package

Latest MB-500 Dumps Valid Version with 117 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe