SAP C_HANATEC_17 SAP Certified Technology Associate – SAP HANA 2.0 SPS05 Online Training
SAP C_HANATEC_17 Online Training
The questions for C_HANATEC_17 were last updated at Nov 01,2025.
- Exam Code: C_HANATEC_17
 - Exam Name: SAP Certified Technology Associate - SAP HANA 2.0 SPS05
 - Certification Provider: SAP
 - Latest update: Nov 01,2025
 
What can you do to shorten the startup time of an SAP HANA system after a reboot?
- A . Flag all columnar tables for preload.
 - B . Set the savepoint interval to a lower value.
 - C . Set the preload column value in the Tables system table to FULL.
 - D . Partition the row store across nodes.
 
Which kinds of patches are available in the SAP HANA2.0 revision strategy? Note: There are 2 correct answers.
- A . Feature Package Stack
 - B . Datacenter Service Point
 - C . Support Package
 - D . Support Package Stack
 
Which trace do you use to create a graphical representation of an individual SQL Statement?
- A . Performance trace
 - B . Expensive statements trace
 - C . SQL trace
 - D . Plan trace
 
You need to set up an SAP HANA system where several companies share the same SAP HANA instance. You have to provide each company a dedicated share of the instance for its data, configuration and user management .
Which deployment scenario do you use?
- A . Multiple Components on One Database (MCOD)
 - B . Multitenant database containers (MDC)
 - C . Technical co-deployment (TCD)
 - D . Multiple Components on One System (MCOS)
 
Which information is provided via the SUM UI? There are 3 correct answers to this question.
- A . The content of log files via the log viewer
 - B . The memory consumption of SUM
 - C . A progress bar for the overall procedure
 - D . The active roadmap step
 
Which backup types you can schedule using SAP Hana cockpit 2.0. There are 2 correct answers to this question.
- A . Delta Backup
 - B . Backup of Configuration files
 - C . Data Backup
 - D . Data Snapshot
 
How can you ensure that the critical database system properties CANNOT be changed by tenant database administrators?
- A . Set up cross-database access control
 - B . Set database isolation levels to high
 - C . Edit the configuration change blacklist
 - D . Assign internal communication ports
 
You install a productive multi-host system with failover capabilities .
Which storage condition prerequisites must be ensured? Note: There are 2 correct answers.
- A . The standby host has file access
 - B . The standby host has NO file access
 - C . The failed worker host has access to write files
 - D . The failed worker host no lonqer has access to write to files
 
You must design a high-availability SAP HANA database system with 8 hosts (6 worker and 2 standby) that also uses multitenant database containers .
Which rules apply? There are 2 correct answers to this question.
- A . The system database must run on the standby host.
 - B . The system database instance must run on all hosts (worker and standby).
 - C . The tenant databases must be able to be scaled out to all hosts (worker and standby).
 - D . The tenant databases must run on the worker hosts.
 
Which information is stored in the SYSTEMDB of an SAP HANA multitenant database container system? Note: There are 2 correct answers.
- A . Topology data on the location of tables and table partitions
 - B . Monitoring data in the SYSTEMDB and all tenant databases
 - C . Users and authorizations of the SYSTEMDB and all tenant databases
 - D . Landscape topology data on the system as a whole