Referring to the exhibit, which configuration change should be performed?

Click the Exhibit button.

You are responsible for managing a Layer 2 network using RSTP for loop prevention. You recently committed the configurations shown in the exhibit. Unfortunately, Switch-2 became the root bridge and you must ensure that Switch-1 becomes the root bridge, when available, for this RSTP topology.

Referring to the exhibit, which configuration change should be performed?
A . Configure the ge-0/0/1 and ge-0/0/8 interfaces on Switch-1 to have a priority of 255.
B. Configure the system MAC on Switch-1 to be higher than the other two switches.
C. Configure the bridge-priority on Switch-1 as 4k.
D. Configure the ge-0/0/1 and ge-0/0/8 interfaces on Switch-1 to have a cost of 0.

Answer: D

Latest JN0-349 Dumps Valid Version with 92 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments