What piece of network equipment should be used?

Project documentation states the system must logically Isolate control and media networks. What piece of network equipment should be used?A . routerB . access pointC . managed switchD . unmanaged switchView AnswerAnswer: C Explanation: A managed switch is essential for logically isolating control and media networks because it allows for...

May 18, 2025 No Comments READ MORE +

In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?

In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?A . detailB . sectionsC . elevationsD . reflected ceilingView AnswerAnswer: D Explanation: To mount a projector so that it is horizontally centered with the...

May 18, 2025 No Comments READ MORE +

Which of these cables should be used for a balanced microphone signal?

Which of these cables should be used for a balanced microphone signal? A . AB . BC . CD . DView AnswerAnswer: A Explanation: Cable A is a shielded twisted pair (STP) cable, which is suitable for carrying balanced microphone signals. Balanced audio cables have three conductors: two for the...

May 17, 2025 No Comments READ MORE +

Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

Your client has requested a 50inch monitor be mounted on the south wail of this boardroom. Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on? A . AB . B.C . CD . DView...

May 16, 2025 No Comments READ MORE +

Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?

Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?A . connected to the networkB . in the rear projection roomC . in a dedicated rack in the roomD . above the projector, plugged into the serial...

May 15, 2025 No Comments READ MORE +

Based on the information in the drawing, what is the MOST LIKELY cause?

After installation, the system does not pass audio. Based on the information in the drawing, what is the MOST LIKELY cause? A . cable lengthsB . system needs a DSPC . phantom power is requiredD . speaker requires a 70 V transformerView AnswerAnswer: C Explanation: The microphone in the setup...

May 14, 2025 No Comments READ MORE +

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled isA . training the client.B . testing and verification.C . invoicing and project close out.D . preventative maintenance schedule.View AnswerAnswer: B Explanation: Upon completion of hardware installation and configuration...

May 14, 2025 No Comments READ MORE +

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?A . allows the AV provider to clean, service and assess equipment In the field on a regular basisB . allows the AV provider to check in with customer and serves as an opportunity to...

May 14, 2025 No Comments READ MORE +

Which section of a program report describes the probable costs of an AV project?

Which section of a program report describes the probable costs of an AV project?A . budgetB . needs analysisC . systems descriptionsD . infrastructure requirementsView AnswerAnswer: A Explanation: The budget section of a program report describes the probable costs of an AV project. This section outlines the estimated expenses for...

May 10, 2025 No Comments READ MORE +

Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?A . request for quoteB . request for proposalC . contract documentsD . bid packet (response)View AnswerAnswer: D Explanation: Company information, statement of work, drawings, and bill of materials are presented...

May 10, 2025 No Comments READ MORE +