If you do not enable summation level editing, where can the changes be made? Please choose the correct answer.

If you do not enable summation level editing, where can the changes be made? Please choose the correct answer.
A . The second level of the forecast structure
B . Any level of the forecast structure
C . Only the top level and lowest levels of the forecast structure
D . Only at the lowest level of the forecast structure

Answer: D