Which exhibit shows the correct plan for VLAN 20 in the wired infrastructure?

Refer to the exhibits. Exhibit 1 Exhibit 2 In the exhibits, VLAN 20 under a device name indicates that the device is configured with that VLAN. The exhibits also indicate whether VLAN 20 is statically configured on each link, either as an untagged or a tagged VLAN. If the link...

February 14, 2020 No Comments READ MORE +

Which procedure meets those needs?

A network administrator needs to create a backplane stack with four AOS-Switches. The administrator wants to choose which switch becomes the commander. Which procedure meets those needs?A . Boot all of the switches at the same time and then connect the backplane stacking links. Then, access the desired commander, and...

February 14, 2020 No Comments READ MORE +

Which type of failure is indicated?

Refer to the exhibits. Exhibit 1 Exhibit 2 Exhibit 1 shows the topology for the network. The network administrator sees the log entries shown in Exhibit 2. Which type of failure is indicated?A . A link between Switch-1 and Switch-2 went down. BFD detected the lost connectivity and behaved as...

February 14, 2020 No Comments READ MORE +

Based on the exhibits, what can administrators determine?

Refer to the exhibits. Exhibit 1 Exhibit 2 Switch-1 and Switch-2 are configured to provide VRRP in VLAN 2. The default gateway for VLAN 2 is set to the VRRP virtual IP. Client-1 in VLAN 2 cannot ping its default gateway. Based on the exhibits, what can administrators determine?A ....

February 13, 2020 No Comments READ MORE +

What is a typical issue that could cause this output?

Refer to the exhibit. Switch-1 and Switch-2 connect on interface A23. The switches experience a connectivity issue. The network administrator sees that both switches show this interface as up. The administrator sees the output shown in the exhibit on Switch-1. What is a typical issue that could cause this output?A...

February 13, 2020 No Comments READ MORE +

Which topology should the administrator use?

Refer to the exhibit. Every switch in the exhibit will route traffic. The company requires a topology in which failover for switch-to ­switch links is exclusively handled by the routing protocol and occurs as quickly as possible. Which topology should the administrator use?A . AB . BC . CD ....

February 13, 2020 No Comments READ MORE +

Refer to the exhibit.

Refer to the exhibit. An AOS-Switch has the ACL shown in the exhibit. A network administrator then enters these commands: Switch(config)# mac-access-list standard myACL Switch(config-std-macl)# deny 007d.45cc.0000 0000.0000.ffff How does this ACL treat these frames: 1 = 007d.45cc.ffff 2 = 007d.45cc.0000A . It denies both frames.B . It permits both...

February 13, 2020 No Comments READ MORE +

Which change to the proposal will help meet the company’s requirements?

Refer to the exhibit. A company requires distribution layer switches that can provide Layer 2 and Layer 3 redundancy. The exhibit shows the proposal for these switches. Which change to the proposal will help meet the company’s requirements?A . The proposed switches should be replaced with switches such as the...

February 12, 2020 No Comments READ MORE +

Which two actions should you perform before you turn over the cluster for production?

You finished a new installation and executed Config Advisor successfully. You review the physical racking and cabling on one of the controllers, and notice an amber light that was not previously on. Which two actions should you perform before you turn over the cluster for production? (Choose two.)A . Remove...

February 12, 2020 No Comments READ MORE +

Which type of issue occurs due to this mismatch?

OSPF Area 1 has two ABRs. One ABR is configured with this range for Area 1: 10.10.0.0/16. The other ABR is not configured with a range for Area 1. Which type of issue occurs due to this mismatch?A . The ABRs create a discontinuous area and disrupt intra-area routing between...

February 11, 2020 No Comments READ MORE +