How can you use the results from a comparable the run to optimize the database migration option (DMO) procedure downtime for a production system? There are 2 correct answers to this question.

How can you use the results from a comparable the run to optimize the database migration option (DMO) procedure downtime for a production system? There are 2 correct answers to this question.

A. Use the Test Cycle option to determine the optimal number of R3load processes.

B. Use the UPGANA.XML analysis file to optimize the number of R3load processes.

C. Use the MIGRATE_DT_DUR.XML file to optimize table splitting and migration sequence.

D. Use the MIGRATE_SOT_DUR.XML file to manually optimize table splitting of large tables.

Answer: A,C

Subscribe
Notify of
guest
1 Comment
Inline Feedbacks
View all comments
malliveluru@gmail.com
1 year ago

Below are the correct answers for this

B. Use the UPGANA.XML analysis file to optimize the number of R3load processes.

C. Use the MIGRATE_DT_DUR.XML file to optimize table splitting and migration sequence.