How can you control the account determination for planned delivery costs based on the condition type?
How can you control the account determination for planned delivery costs based on the condition type?
A . Assign an account key in the condition type.
B. Assign an account key in the calculation schema.
C. Assign an account key in the condition record.
D. Assign an account key in the access sequence.
Answer: B
Latest C_TS452_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	