Which of the following are product risks and which are project risks?

Case Study: 2 Scenario Your organization is a large media services corporation (MSC). MSC uses Agile development, within a Scrum framework. Here, the iterations are referred to as Sprints. For each Sprint, a set of user-stories is defined, built, and tested. The user-stories are typically 12 lines long, indicating what...

August 23, 2023 No Comments READ MORE +

Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?

Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?A . That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested. B. That the functional specification accurately reflects requirements R1 and R2. C....

August 21, 2023 No Comments READ MORE +

Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?

Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?A . Test policy-Test strategy-Project test plan-System test plan B. Test strategy-Test policy-Project test plan-System test plan C. Test policy-Project test plan-Test strategy-System test plan D. Project test plan-Test strategy-System test...

August 20, 2023 No Comments READ MORE +

Which of the following review types would be recommended at the start of each Sprint, for the reason given?

Which of the following review types would be recommended at the start of each Sprint, for the reason given?A . An inspection, to find errors in the user-stories. B. A management review, to check that the user-stories will accurately reflect the rules for accessibility. C. A walkthrough of the set...

August 18, 2023 No Comments READ MORE +

Which one is a product risk associated with the air quality management system?

Case Study: 1 Scenario A computerized system is being created to monitor the life support system on board a submarine. It monitors air quality, water supplies and temperature. This system will be supplied and maintained by SubsInc. SubsInc uses the V-model for software development and conducts four levels of testing,...

August 16, 2023 No Comments READ MORE +

Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?

Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?A . Decision Testing. B. Statement Testing. C. Data flow Testing. D. Boundary Value Analysis.View AnswerAnswer: D

August 15, 2023 No Comments READ MORE +

When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?

When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?A . A walkthrough. B. A technical review. C. A management review. D. A code inspection.View AnswerAnswer: B

August 15, 2023 No Comments READ MORE +

Which stage of the Fundamental Test Process will be most affected by the use of user-stories as defined above?

Which stage of the Fundamental Test Process will be most affected by the use of user-stories as defined above?A . Creating a schedule of activities as part of test planning. B. Creating test cases as part of test design. C. Creating the test environment as part of test execution. D....