During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note: 3 correct answer

During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note: 3 correct answer
A . Report type
B. Confirmation profiles
C. Code groups
D. Partner profiles
E. Status profiles

Answer: A,B,C