Currently, several groups and project robs are listed in every system event of the DEV Notification Scheme and should remain that way. A new requirement states that when DEV issues move from the status Open to status Assigned, only Project Rob (Managers) should be notified. DEV project does not share any of its schemes.

Currently, several groups and project robs are listed in every system event of the DEV Notification Scheme and should remain that way. A new requirement states that when DEV issues move from the status Open to status Assigned, only Project Rob (Managers) should be notified. DEV project does not share any of its schemes.

Identify the event that needs to be configured.
A . Custom event
B . Issue Moved
C . Issue Assigned
D . Work Started On Issue

Answer: C

Latest ACP-120 Dumps Valid Version with 28 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments