BICSI RCDDv14 BICSI Registered Communications Distribution Designer – RCDDv14 Online Training
BICSI RCDDv14 Online Training
The questions for RCDDv14 were last updated at Nov 01,2025.
- Exam Code: RCDDv14
 - Exam Name: BICSI Registered Communications Distribution Designer – RCDDv14
 - Certification Provider: BICSI
 - Latest update: Nov 01,2025
 
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)
- A . Schedule
 - B . Contract administration
 - C . Legal matters
 - D . Technical considerations
 - E . Financial matters
 
Which of the following team members is responsible for ensuring compliance with me contract documents (CDP
- A . Owner
 - B . lCT Distribution Designer
 - C . Architect
 - D . Construction Manager (CM)
 
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
- A . stakeholder requirements
 - B . a safety plan
 - C . a user needs analysis
 - D . specific products and materials
 
The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the MINIMUM solution/solutions for the client?
- A . Category 5e
 - B . Category 6
 - C . Category 6A
 - D . Category 7
 
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
- A . Category 5e/class D
 - B . Category 6/class E
 - C . Category SA/class EA
 - D . Category 7/class F
 
Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?
- A . General Contractor
 - B . ICT distribution designer
 - C . Client
 - D . Architect. Engineering, Consultant Team
 
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)
- A . Discuss design concerns with inspectors. AHJs, and other stakeholders.
 - B . Verify that the overall physical security design complies with the owner expectations.
 - C . Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project’s critical path.
 - D . Ensure the construction materials are stored properly and protected from theft.
 - E . Coordinate electrical supply so it is available in advance of the starting of contractor work.
 
A 3 trade size conduit is sized at
- A . 78 mm (3 in)
 - B . 91 mm (3 1/2 in)
 - C . 103 mm (4 in)
 - D . 129 mm (5 in)
 
Which of the following options BEST describes Request for Quote (RFQ)?
- A . Usually provides more detail involved with selecting the material, equipment, and components required during implementation (e.g. make, model, performance specifications)
 - B . Can be submitted by the contractor in response to a field order or as an uninitiated request for a change in scope
 - C . Used to obtain a formal response to the contract documents
 - D . An invitation for the design professionals (e g, architect, engineer, consultant) or contractors to submit a proposal for services
 
Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">
- A . OM1 (62 50/125 multimode)
 - B . OM2 (50/125 multimode)
 - C . OM3 (50/125 laser optimized multimode)
 - D . OM4 (50/125 laser optimized multimode)