Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)
- A . Schedule
- B . Contract administration
- C . Legal matters
- D . Technical considerations
- E . Financial matters
Which of the following team members is responsible for ensuring compliance with me contract documents (CDP
- A . Owner
- B . lCT Distribution Designer
- C . Architect
- D . Construction Manager (CM)
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
- A . stakeholder requirements
- B . a safety plan
- C . a user needs analysis
- D . specific products and materials
The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the MINIMUM solution/solutions for the client?
- A . Category 5e
- B . Category 6
- C . Category 6A
- D . Category 7
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
- A . Category 5e/class D
- B . Category 6/class E
- C . Category SA/class EA
- D . Category 7/class F
Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?
- A . General Contractor
- B . ICT distribution designer
- C . Client
- D . Architect. Engineering, Consultant Team
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)
- A . Discuss design concerns with inspectors. AHJs, and other stakeholders.
- B . Verify that the overall physical security design complies with the owner expectations.
- C . Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project’s critical path.
- D . Ensure the construction materials are stored properly and protected from theft.
- E . Coordinate electrical supply so it is available in advance of the starting of contractor work.
A 3 trade size conduit is sized at
- A . 78 mm (3 in)
- B . 91 mm (3 1/2 in)
- C . 103 mm (4 in)
- D . 129 mm (5 in)
Which of the following options BEST describes Request for Quote (RFQ)?
- A . Usually provides more detail involved with selecting the material, equipment, and components required during implementation (e.g. make, model, performance specifications)
- B . Can be submitted by the contractor in response to a field order or as an uninitiated request for a change in scope
- C . Used to obtain a formal response to the contract documents
- D . An invitation for the design professionals (e g, architect, engineer, consultant) or contractors to submit a proposal for services
Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">
- A . OM1 (62 50/125 multimode)
- B . OM2 (50/125 multimode)
- C . OM3 (50/125 laser optimized multimode)
- D . OM4 (50/125 laser optimized multimode)