______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.

______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.A . Risk criteriaB . Risk planC . Risk analysisView AnswerAnswer: A

June 20, 2019 No Comments READ MORE +

The primary work products of the rbi assessment and management approach and implementation of rbi provides

The primary work products of the rbi assessment and management approach and implementation of rbi providesA . Overall reduction of risk and acceptance of current riskB . Overall increase of risk and acceptance of riskC . Overall reduction of risk and negligence of current riskD . Overall increase of risk...

June 18, 2019 No Comments READ MORE +

Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and rates

Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and ratesA . Process specialistsB . Plant operation specialistsC . Asset integrity expertsD . Inspection engineersView AnswerAnswer: A

June 18, 2019 No Comments READ MORE +

Following are some of the recognized risks which cannot be managed by inspection alone except one

Following are some of the recognized risks which cannot be managed by inspection alone except oneA . Equipment nearing retirementB . Failure mechanisms (such as brittle fracture, fatigue) where avoidance of failure primarily depends on operating within a defined pressure/temperature envelopeC . Consequence-dominated risksD . The suitability and current condition...

June 18, 2019 No Comments READ MORE +

The models are evaluated_____________to provide both qualitative and quantitative insights about the level of risk and to identify the design, site, or operational characteristics that are the most important to risk

The models are evaluated_____________to provide both qualitative and quantitative insights about the level of risk and to identify the design, site, or operational characteristics that are the most important to riskA . ProbabilisticallyB . StatisticallyC . LinearlyD . LogicallyView AnswerAnswer: D

June 17, 2019 1 Comment READ MORE +

The primary audience for rp 580 is

The primary audience for rp 580 isA . Inspection and materials engineering personnelB . Maintenance personnelC . Only inspection personnelD . Only materials engineering personnelView AnswerAnswer: C

June 17, 2019 No Comments READ MORE +

If the probability and consequence combination (risk) is high enough to be unacceptable, then

If the probability and consequence combination (risk) is high enough to be unacceptable, thenA . A mitigation action to predict or prevent the eventis recommended.B . A mitigation action to predict or prevent the event isnot recommendedC . Warrant to analyze risks involvedView AnswerAnswer: A

June 16, 2019 No Comments READ MORE +

A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable level

A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable levelA . Risk managementB . Risk mitigationC . Risk controlView AnswerAnswer: A

June 15, 2019 No Comments READ MORE +

The amount and type of codes and standards used by a facility can have

The amount and type of codes and standards used by a facility can haveA . Significant impact on rbi resultsB . No impact on rbi resultsC . Less significant impact on rbi resultsView AnswerAnswer: A

June 13, 2019 No Comments READ MORE +

Thing or activity with a potential for con- sequence

Thing or activity with a potential for con- sequenceA . SourceB . HazardC . ToxicView AnswerAnswer: A

June 12, 2019 No Comments READ MORE +