A third collaboration call fails between the backbone site and the HQ site. After reviewing the exhibits, which of the following reasons could be causing this failure?

Scenario:

There are two call control systems in this item.

The Cisco UCM is controlling the Cisco Jabber for Windows Client, and the 7965 and 9971 Video IP Phone.

The Cisco VCS is controlling the SX20, the Cisco TelePresence MCU, and the Cisco Jabber TelePresence for Windows.

DP:

Locations:

CSS:

Movie Failure:

Movie Settings: CIPTV2 Topology: Subzone:

Links:

Pipe:

A third collaboration call fails between the backbone site and the HQ site. After reviewing the exhibits, which of the following reasons could be causing this failure?
A . Not enough bandwidth has been allocated.
B . Device Pool.
C . Location.
D . The pipe is not functioning.

Answer: A

Latest 300-075 Dumps Valid Version with 520 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments