Which five actions should you perform in sequence?
DRAG DROP
A company uses separate finished good item numbers for size variations of the same product. The company wants to minimize the number of variously-sized items that are created. You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list
of actions to the answer area and arrange them in the correct order. 

Answer: 
Explanation:
Reference: https://gfeaxblog.wordpress.com/2017/09/28/o365-how-to-create-product-masters/
Latest MB-320 Dumps Valid Version with 141 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	