Which Workflow Pattern should be employed to meet this requirement?
A business process splits from a single path into five parallel branches and later joins into a single path. The business requirement states that two of the parallel branches must be completed before the single path that follows the join can progress. When the remaining parallel paths complete, they are discarded.
Which Workflow Pattern should be employed to meet this requirement?
A . Structured Discriminator
B . Structured Partial Join
C . Multi-Merge
D . Cancelling Partial Join
E . Structured Synchronizing Merge
Answer: B
Latest TCP-BW6 Dumps Valid Version with 207 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	