Which Software Development lifecycle is the Test Manager most likely following?
A test manager defined the following test levels in her test plan; Component, System and Acceptance.
Which Software Development lifecycle is the Test Manager most likely following?
A . V-Model
B . Agile
C . Waterfall
D . Prototyping
Answer: A
Explanation:
The test manager is most likely following the V-model for software development. The V-model is a software development model that defines four testing levels that correspond to four development phases: component testing corresponds to component design, integration testing corresponds to architectural design, system testing corresponds to system requirements specification, and acceptance testing corresponds to user requirements specification. The V-model also defines the test planning and test execution activities for each testing level. Agile is a software development model that follows an iterative and incremental approach, where testing is integrated into each iteration and adapts to changing requirements and feedback. Waterfall is a software development model that follows a sequential and linear approach, where testing is performed after the development phase is completed. Prototyping is a software development model that involves creating a simplified version of the software to elicit user feedback and validate requirements before developing the final product.
Verified Reference: A Study Guide to the ISTQB® Foundation Level 2018 Syllabus – Springer, page 18.
Latest ISTQB-CTFL Dumps Valid Version with 76 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund